Total Projects

Total Cost

Unique Contractors

πŸ’° Compare Budget with Flood Control

See how budget allocations correlate with flood control projects

πŸ“Š View Budget-Flood Correlation β†’

πŸŒ‰ Compare Flood with DIME Infrastructure

Analyze overlap between flood control and infrastructure projects

πŸ—οΈ View Flood-DIME Correlation β†’

πŸ“Š Contractor-District Correlation

Statistical analysis of concentration patterns between contractors and districts

🎯 View Statistical Analysis β†’

πŸ† Top Districts by Number of Projects

Total Districts: -

Leading District: - with - projects

Page 1 of 1

Contractor Project Distribution (Standard Deviation Analysis)

Average Projects per Contractor: -

Standard Deviation: -

Contractors Beyond 3 SD: - (Highly Unusual)

Contractor Project Distribution (Scatter Plot Analysis)

Each point represents one contractor

Color coding: Green (normal), Yellow/Orange (suspicious), Red/Purple/Pink (outliers)

Circle size: Larger circles indicate higher total contract cost per contractor

Hover over points to see contractor details

Most Expensive Projects

Types of Work

Projects by Year

πŸ’° Total Budget by Year

Total Budget: β‚±0

Average per Project: β‚±0

Highest Year: -

Projects Heat Map by Province (Click to view detailed map)

πŸ“‹ Project Table View

🚩 Red Flag Legend

  • Chop-chop β€” projects that are artificially segmented into phases.
  • Siyam-siyam β€” projects with unreasonably prolonged implementation.
  • Doppelganger β€” projects that are suspiciously similar in cost and/or duration.
  • Ghost projects β€” projects that might be non-existent.
Project Region Year Type Flags Cost Contractor
⟳
Loading data...
Showing 0 of 0 projects
Page 1

πŸ“ Proximity Analysis: Same Amount, Close Location

Projects with identical contract amounts located within 1km of each other. Each pair has the exact same cost and is geographically close, which may warrant investigation.

🎯 Badge Legend

πŸ’€ CRITICAL - Impossible patterns
πŸ”₯ HIGH - Strong suspicion
⚠️ MEDIUM - Needs investigation
Diff Desc - Different descriptions
Diff Contractor - Different contractors
Diff Year - Different years
Same Contractor - Same contractor
Same Year - Same year
Exact Coords - Exact same coordinates
5 Zeros - 5 consecutive zeros
6+ Zeros - 6+ consecutive zeros
Multi-Phase - Multi-phase project
Up/Downstream - Upstream/downstream
Left/Right - Left/right banks
🚨 Suspicion Levels: Each pair is automatically scored based on how suspicious the pattern is:
  • πŸ’€ CRITICAL (Red):
    • Only year differs with everything else identical - strong indicator of copy-paste error
    • Same amount to the centavo across different years - virtually impossible as material prices/inflation change yearly
    • Perfectly round amounts (β‚±96,500,000.00) at exact same location - highly suspicious template/placeholder
    • Amounts ending with 6+ consecutive zeros (β‚±96,500,000.000000) - extremely suspicious rounding
  • πŸ”₯ HIGH (Orange):
    • Same amount to the centavo at exact coordinates, same year
    • Identical project description, contractor, and location - likely duplicate entry
    • Amounts ending with 5 consecutive zeros - suspicious rounding pattern
  • MEDIUM (Yellow): Same exact location (0km) but with some differences - requires investigation
  • Low (White): Close proximity but clear differences in project details
πŸ”΅ Multi-Component Detection: Suspicion is lowered by one level (e.g., VERY HIGH β†’ HIGH) if detected:
  • Multi-Phase: "Phase I", "Phase 2", etc. in both descriptions
  • Up/Downstream: "Upstream" or "Downstream" in both descriptions
  • Left/Right: "Left bank/side" or "Right bank/side" in both descriptions
Important: Even for legitimate multi-component projects, identical amounts remain suspicious as each component should have different scope/costs.
πŸ’‘ Critical Insight: A properly scoped construction project should ALWAYS have centavos due to:
  • Material costs that don't divide evenly
  • Labor calculations with time fractions
  • Tax calculations creating decimals
  • Engineering estimates with precision
Therefore:
  • Identical amounts to the centavo across different years = highly suspicious copy-paste
  • Perfectly round amounts (β‚±96,500,000.00) at exact same location = highly suspicious template/placeholder
  • Amounts ending with 6+ zeros (β‚±96,500,000.000000) = suspicious rounding patterns
  • The ONLY legitimate round amounts would be budget templates, not actual project costs

Total Pairs Found

Loading...

Exact Location Pairs

Loading...

Avg Distance

Loading...

# Distance Red Flags Project 1 Project 2
Loading proximity data...

πŸ‘₯ Contractor Analysis

Analyze contractor performance, project counts, and spending patterns

Total Contractors

Top Contractor

Avg Projects/Contractor

Loading...

Avg Cost/Project

Loading...

Contractor Name SEC Status Projects Total Cost Avg Cost/Project Suspicion Score
πŸ“Š
Loading contractor data...
0 of 0 contractors

πŸ•ΈοΈ Joint Venture Network

Visualize relationships between companies through joint ventures. Each connection represents a shared project.

Total JVs

Loading...

Unique Companies

Loading...

Total JV Value

Loading...

Avg JV Value

Loading...

Legend:

Company (Few JVs)
Company (3-4 JVs)
Company (5-9 JVs)
Company (10+ JVs)
Joint Venture Project
JV Connection
⚠️ Similar Names

Note: Node size = total contract value. Hover over nodes/lines for details. Click and drag to explore. Dashed red lines indicate potentially same company with different names.